Industrial Pressure Tanks (Diaphragm & Bladder)

Industrial Pressure Tanks (Diaphragm & Bladder)

Pre-charged diaphragm and replaceable-bladder pressure tanks for water booster systems, well pumps, hydropneumatic distribution, thermal expansion, and surge protection. 8 to 5,000 litres.

Capacity

8 – 5,000 L

Working Pressure

0.6 / 1.0 / 1.6 / 2.5 MPa

Bladder Material

EPDM / Butyl / NBR

Tank Material

CS epoxy-lined / 304 SS / 316L SS

Industrial Pressure Tanks (Diaphragm & Bladder) | HENG RONG

Overview

Pressure tanks store pressurized water in a closed system, absorbing pressure fluctuations caused by pump start/stop, thermal expansion, or sudden demand changes. The pre-charged air cushion (separated from water by a diaphragm or bladder) acts as a hydraulic accumulator — reducing pump cycling frequency, protecting piping from water hammer, and maintaining system pressure during peak demand. Properly sized pressure tanks extend pump life by 3–5× and eliminate pressure shock in piping systems.

Engineering Features

💪

Pre-charged Air Cushion

Factory pre-charged to 70% of system pressure. Field adjustable via Schrader valve. Optimal pre-charge maintains maximum water acceptance volume.

🔄

Replaceable Bladder

Bladder type: bladder replaceable without removing tank from system. Diaphragm type: welded diaphragm, simpler construction for smaller sizes.

🏗

Multiple Construction Options

CS + food-grade epoxy lining (cost-effective, standard): for general water service. 304 SS (no lining needed): for potable water, food contact, and marine service. 316L SS: for seawater, chemical, and pharmaceutical service.

🎚

Wide Pressure Range

0.6, 1.0, 1.6, and 2.5 MPa pressure classes. Match to your system’s maximum allowable working pressure.

Reduces Pump Cycling

Properly sized tank keeps pumps from short-cycling (< 6 starts/hour). Extends motor life and reduces energy consumption by maintaining steady system pressure.

🔧

Standard Connections

BSP or NPT threaded connections for small tanks. Flanged connections for large vessels. Compatible with all major pressure gauge and relief valve sizes.

Technical Specifications

Capacity8 – 5,000 L
Working Pressure0.6 / 1.0 / 1.6 / 2.5 MPa
Bladder MaterialEPDM / Butyl / NBR
Tank MaterialCS epoxy-lined / 304 SS / 316L SS

Typical Applications

  • 🏗 Pump Booster Systems — Absorbs pressure spikes and extends pump life in building water supply and irrigation booster sets.
  • 🌊 Well Pump Systems — Hydropneumatic storage vessel providing pressure buffer and reducing well pump start frequency.
  • 🔥 Thermal Expansion — Absorbs volume expansion in closed heating/cooling systems — prevents over-pressure and relief valve activation.
  • 💧 Water Hammer Control — Dampens pressure transients caused by rapid valve closure in distribution systems.
  • 🏭 Industrial Process Buffering — Maintains steady pressure supply to process equipment during demand fluctuations.
  • ❄️ Chilled Water Systems — Thermal expansion vessel in chilled water loops for building HVAC systems.

Frequently Asked Questions

What pre-charge pressure should I set?

Set pre-charge to 70% of system cut-in pressure. Example: if pump cuts in at 3 bar, set pre-charge to 2.1 bar. This maximizes the usable water volume in the tank and minimizes pump cycling.

How do I size a pressure tank for my booster pump?

Key inputs: pump flow rate (L/min), cut-in pressure, cut-out pressure, and maximum allowable starts/hour. We calculate the required total tank volume and provide a sizing recommendation.

What is the difference between diaphragm and bladder types?

Diaphragm tanks: diaphragm is bonded to the tank wall — cannot be replaced but simpler and lower cost. Bladder tanks: removable bladder serviceable without tank removal — preferred for larger tanks and applications where bladder wear is expected.

How long do bladders last?

EPDM bladders: 7–10 years in potable cold water service. Butyl: similar life, better for slightly elevated temperatures. Replace when tank fails to maintain pressure or bladder is visibly damaged.

Lead time?

Standard sizes (8–500 L): 10–20 days. Large tanks (>500 L) or SS construction: 20–35 days.

Often Specified Together

Bag Filter Housings
Water Softeners
Stainless Steel Tanks

Need a Custom Industrial Pressure Tanks (Diaphragm & Bladder)?

Send us your water analysis and required capacity. Our engineers will respond with a sized proposal and budget within 24 hours.

📧 sales@szhrscl.com  |  📱 +86 138 2871 5252

Scroll to Top